Board
A board with rules
Tickets move through a fifteen-status lifecycle. The API refuses illegal moves and role violations instead of only hiding a button.
Product · Repairs and parts
Diagnosis, repair, parts and QC happen against the ticket the customer was checked in on — not a whiteboard, a notebook or a second spreadsheet.
Fifteen guarded statuses · parts consume and return · completed logs stop changing
Repair ticket · today
iPad Air 5 · space grey · 256 GB
Screen cracked after a drop. Touch still works. Charger and folio case received.
Approved
₦86,000
Paid
₦86,000
Balance
₦0
Timeline
On the bench
Every move on the bench leaves a record on the job, and every part leaves a paired stock movement.
Board
Tickets move through a fifteen-status lifecycle. The API refuses illegal moves and role violations instead of only hiding a button.
Logs
Engineers record findings, work performed, a verdict and labour minutes. A completed log cannot be quietly edited.
Parts
Consuming a part writes a stock movement, lands the cost on the repair and fails if the shelf cannot cover it.
QC
A QC log and checklist stay on the ticket, so the person releasing the device knows what was tested.
The bench flow
The next person can pick up the ticket without a handover conversation.
Put the job in a queue or with a technician, then record the findings and the verdict.
Attach parts as the repair proceeds. Stock, cost and the job line update together.
Write the repair log, run the QC checklist and mark the job ready. Completed logs stay frozen.
Accessories, warranty, repair report and the person releasing the device are recorded at the counter.
Where it pays off
The bench record matters most when several people touch a job or when parts cost is the difference between a profitable repair and a busy one.
External bench records carry a partner, a fee and a name, so work that leaves the shop still returns to the record.
Try the repair board, parts consumption and QC on a seeded demo shop.